New: hand feedback to your AI agent over MCP

Website requirements document template, with an example for every section

•11 min read•Photo of Kevin LarssonKevin Larsson
Website requirements document template, with an example for every section

A website requirements document is a short, signed document that says what a new website must do, who it's for, and how everyone will know it's finished. It covers goals, audience, scope and sitemap, features, content, design, technical setup, integrations, SEO, accessibility, analytics, and the acceptance criteria the finished site is tested against. Below is a template you can copy, a filled-in example for every section, and how to run the requirements conversation with a client.

You'll also see it called a client requirements document, a website requirements template or a website specification. On a small project it can be four pages long. What matters is that the client signs it before design starts, because it's the document you'll both open when someone asks "wasn't that included?"

I build Huddlekit, a website feedback tool, so I spend a lot of time around the review end of web projects. The arguments there are rarely about what was agreed. They're about what nobody wrote down.


Requirements document, brief, plan or proposal?

Four documents get mixed up at the start of a website project. Here's what each one is for:

DocumentWhat it answersWhen you write it
Project briefWhy the site is being built, and what success looks likeAfter the first call
Requirements documentWhat the site must do, in enough detail to build and test itAfter discovery, before the final estimate
Project planWho does what, in what order, by whenOnce the requirements are agreed
Proposal or contractWhat it costs, and on what termsWith the requirements, or right after

The requirements document turns the brief into something you can estimate, schedule and test. The website project plan template takes it from there.


The website requirements document template

Copy this into Notion, Google Docs or Word and fill it in. It's written in Markdown, so Notion turns it into headings and lists when you paste it. The sections after it explain each part, with examples from a made-up project: a new WordPress site for Acme Physical Therapy, a practice with three clinics.

# Website requirements: [project name]

- Version: 1.0
- Date: [date]
- Prepared by: [name]
- Approved by: [client lead's name]

### Goals

- Why the site is being built now:
- Goal 1, and how we'll measure it:
- Goal 2, and how we'll measure it:

### Audience

- Visitor groups, most important first:
- What each group needs to find or do:

### Scope and sitemap

- Pages and templates:
- Content moving from the current site:
- Out of scope:

### Functional requirements

- F1 (Must, Should or Could):
- F2:
- F3:

### Content

- Who writes, supplies and approves each page:
- Photos and video:
- Date all content is due:

### Design

- Brand assets supplied:
- Reference sites, and what the client likes about each:
- Screen sizes the design must cover:
- Things to avoid:

### Technical and hosting

- Platform:
- Hosting, domain and DNS, with the account owner for each:
- Browsers and devices supported:
- Performance targets:
- Staging site:

### Integrations

- Tool, what it does on the site, account owner:

### SEO

- URLs to keep, and the redirect plan:
- Page titles and descriptions:
- XML sitemap and search console:

### Accessibility

- Target standard:
- Who writes alt text and captions:
- How it will be tested:

### Analytics

- Tool:
- Actions to track:
- Cookie consent:

### Acceptance criteria

- Criteria for each Must requirement:
- The site is accepted when:

### Sign-off and changes

- Signed by, and date:
- How changes after sign-off are handled:
- Change log:

How to fill in each section

Goals

Two or three goals, each with a way to check it after launch. "A modern look" isn't a goal. "More appointments booked through the site" is.

Example:

  • More online bookings, measured by bookings started from the site each month, against the three months before launch.
  • Fewer phone calls about opening hours and parking, measured by a front desk tally for four weeks before and after launch.

Audience

Who the site is for, in order of importance, and the main thing each group comes to do. This decides the navigation and what goes on the homepage.

Example:

  • New patients: find the nearest clinic, check that their problem is treated, book a first visit.
  • Existing patients: rebook, and find hours and parking.
  • Doctors who refer patients: find out how to send a referral.

Scope and sitemap

List every page or template, and write down what's out of scope as carefully as what's in. The out-of-scope column is the one you'll point to most.

Example:

In scopeOut of scope
Home, 3 clinic pages, 8 treatment pages, team, pricing, blog, contactAn online shop
Moving 35 blog posts from the current siteA second language
Booking through the practice's existing booking systemPatient logins or records

Functional requirements

What the site must do, one requirement per line, each with an ID and a priority. Write every requirement so someone could test it: "visitors can book from every clinic page" can be tested, "easy booking" can't. The IDs let feedback and test results point at a requirement, as in "F2 fails on a phone".

For priority, use Must (launch waits for it), Should (expected, but launch doesn't wait) and Could (only if time allows). It's the MoSCoW method, with your out-of-scope list as the Won't column.

Example:

IDRequirementPriority
F1Visitors can book from every clinic and treatment page, through the existing booking systemMust
F2The contact form goes to the clinic the visitor picks, and the visitor gets a confirmation emailMust
F3Staff can publish a blog post with an image, without a developerMust
F4Each clinic page shows a map, opening hours and parking detailsShould
F5Visitors can filter treatments by body areaCould

Content

Who writes each page, who approves it, what moves over from the old site, and when it's due. Late content is one of the most common reasons launches slip, so it gets owners and dates like any other deliverable.

Example:

  • Clinic and treatment pages: written by the practice manager, approved by the clinical director, due at the end of week 4.
  • Blog: 35 posts move over as they are. Posts with no visits in the last year are dropped.
  • Photos: a half-day shoot at each clinic, booked by Acme.

Design requirements

Website design requirements cover the brand assets, the look the client wants and the screen sizes the design must work on. Ask for links to sites the client likes and what exactly they like about each, because "clean and modern" means something different to everyone.

Example:

  • Brand: the existing logo and colors stay, and a new typeface is fine. Brand guidelines supplied as a PDF.
  • References: one site the client likes for its booking flow, another for its photography, and a competitor's site as an example of what to avoid.
  • Screen sizes: designs at phone and desktop width, with tablet checked during the build.
  • Avoid: stock photos of smiling people in white coats.

Technical and hosting

The platform, hosting and domain, who owns each account, which browsers and devices are supported, and any performance targets. Ask for account access on day one, not in launch week.

Example:

  • Platform: WordPress, with a theme built for this project.
  • Hosting: managed WordPress hosting, paid for by Acme and run by the agency.
  • Domain: Acme owns the registrar account and gives the agency access. Email must keep working when the domain moves to the new site.
  • Browsers: the latest two versions of Chrome, Safari, Firefox and Edge on desktop, plus Safari on iPhone and Chrome on Android.
  • Performance: Core Web Vitals in the "good" range on mobile.
  • Staging: a password-protected staging site the client can open from week 5.

Integrations

Every tool the site connects to, what it does on the site, and who owns the account. Integrations are where estimates often go wrong, so name the exact tool instead of writing "CRM integration".

Example:

ToolWhat it does on the siteAccount owner
Booking systemBooking on clinic and treatment pagesAcme
MailchimpNewsletter sign-up in the footerAcme
Google MapsA map on each clinic pageAcme, set up by the agency

SEO

What has to survive the move: the URLs that bring in search traffic, page titles and descriptions, the XML sitemap and search console. On a redesign, this section protects the rankings the client already has.

Example:

  • The 20 pages with the most search traffic keep their URLs, or redirect one to one to their closest new page.
  • Every page gets its own title and meta description, written along with the copy.
  • The CMS generates an XML sitemap, submitted in Google Search Console at launch.

Accessibility

Name a standard instead of writing "accessible". WCAG 2.2 level AA is the usual target, and some laws and contracts require accessibility outright. Then say who writes the alt text and captions.

Example:

  • Target: WCAG 2.2 AA on every template.
  • Alt text: written by Acme with the copy, checked by the agency.
  • Video: captions on every video.
  • Testing: an automated scan of every template, plus a keyboard-only run through the booking flow. The accessibility checklist covers the rest.

Analytics

The tool, the actions that count as conversions, and how cookie consent works. Agree on it before the build, so tracking goes in with the pages instead of after launch.

Example:

  • Tool: Google Analytics 4.
  • Track: clicks on booking buttons, form submissions, taps on phone numbers and newsletter sign-ups.
  • Consent: analytics runs only after a visitor accepts cookies.

Acceptance criteria

How you'll decide the site is done. Write criteria for each Must requirement, plus one rule for the whole site, and agree on them now rather than in the last week. They become the script for acceptance testing, and the user acceptance testing template shows how to run it.

Example:

  • F1 passes when a test booking from each clinic page arrives in the booking system under the right clinic, on desktop and on a phone.
  • F2 passes when a test message to each clinic reaches that clinic's inbox and the sender gets a confirmation.
  • The site is accepted when every Must requirement passes, no critical bugs are open, and the client lead confirms it in writing.

Sign-off and changes

Who signs, the date and the version number. Then how changes work after sign-off: the client asks in writing, you estimate the time and cost, the client approves, and the change goes into the plan. Keep a change log at the end, so version 1.3 shows what changed since 1.0.

Example:

  • Signed by Acme's clinical director, version 1.0, with the date.
  • Changes: requested by email, estimated within two working days, approved in writing before work starts.

How to run the requirements conversation

  1. Send a questionnaire first. The basic facts (who, what, budget, dates) come back in writing, and the meeting can go on the hard parts. Here's a website design questionnaire to start from.
  2. Get the decision-maker in the room. Requirements agreed with someone who can't approve them get agreed again later, with changes.
  3. Walk through the current site together. Go page by page: keep, change or drop. You can do this in Huddlekit: paste the current site's URL, share the link, and the client pins a comment on everything they want kept, changed or gone. Each comment saves a screenshot and the page it was left on, so the walk-through doubles as a written audit.
  4. Ask why behind every feature. "We need a patient portal" might mean "patients keep calling about their invoices". The why decides the requirement, and a smaller feature often does the job.
  5. Sort, then cut. Must, Should, Could, and an explicit out-of-scope list. Estimate the Musts first.
  6. Write it up within two days and send it for comments. One round of edits, then sign. A requirements document that stays a draft for weeks stops being anyone's.

Web design requirements checklist

Before you send the document for sign-off, check that:

  • Every goal has a way to measure it
  • Every page in the sitemap has a content owner and a due date
  • There's an out-of-scope list, and the client has read it
  • Every functional requirement has an ID, a priority and acceptance criteria
  • Every integration names the exact tool and the account owner
  • Supported browsers, devices and screen sizes are listed
  • Old URLs have a redirect plan
  • Accessibility has a named standard
  • Analytics lists the actions to track
  • One person signs, and the change process is written down

Frequently asked questions

What is a website requirements document?

A document that sets out what a website must do before anyone designs or builds it: the goals, audience, pages, features, content, design, technical setup, integrations, SEO, accessibility, analytics and acceptance criteria. The client signs it, and it becomes the reference for the estimate, the project plan and the final sign-off.

Who writes the website requirements document?

Usually the agency or freelancer, from the client's questionnaire answers and a requirements meeting. The client reviews it and signs it. When clients write their own, it tends to be a wish list, and the person building the site still has to turn it into requirements they can estimate and test.

How detailed should website requirements be?

Detailed enough to estimate and test, and no further. If two developers would quote a requirement very differently, it's too vague. If it says how something must be built rather than what it must do, it's probably too detailed.

What are website design requirements?

The part of the requirements document about look and feel: brand assets, reference sites and what the client likes about them, the screen sizes the design must cover, imagery, and anything to avoid. They give the designer constraints before the first mockup instead of after it.

What's the difference between a client requirements document and a project brief?

The brief explains why the site is being built and what success looks like, usually on one page. The client requirements document goes further: what the site must do, in enough detail to estimate, build and test it. The brief comes first, and the requirements build on it.

What happens when requirements change after sign-off?

They go through the change process written in the document: the client asks in writing, you estimate the time and cost, and the client approves before work starts. Update the version number and the change log, so the document stays the one record of what's being built.

Write it down once

Every requirement in this template gets decided at some point in a project. The only question is whether that happens on paper before the build, or in a feedback round after it, when changing course costs real time.

When the build reaches review, the client checks the staging site against the acceptance criteria. Huddlekit gives them one link to comment on the page itself, so every comment arrives with the element, the page and the screen size, and nobody has to describe where the problem is.

Collect feedback in minutes without the friction.